<%@LANGUAGE="VBSCRIPT" CODEPAGE="1252"%> Think-Well
  Think-Well HomeThink-Well Intranet
news track record people opportunities contacts fundamentals tool-kit outcome modelling hpht topics products links
     
 

products

HPHT
x-comp <<<
e-well

 

 
     

 

 

 

 

 

     
 

X-Comp

Having evolved over almost 4 years, XCOMP will, through the use of a 'learning extractor', a 'Validator engine' and powerful visualisation, enable completion engineers to emulate the planned well operation for an ultimate 'complete well on paper' exercise.

XCOMP is very much in line with achieving better processes within the Oil and Gas industry.

XCOMP is primarily designed as a predictive visual tool for completions and well operations, but can also be used for learning, right scoping (used on several possible designs) and end of well reporting.

Designed for;

bullet Plans Generic or Specific Completion Operations.
bullet Predicting and reducing potential NPT events (No completion surprises).
bullet Reducing unwanted and unnecessary completion events (approaching the technical limit).
bullet

Aid in the selection of 'best suited equipment' for the planned completion (correct scoping).

bullet Auto-implements Best Practice.
bullet Auto-implements relevant learning from similar operations and similar equipment.
bullet Auto-Validates Incompatibilities.
bullet Predict (or warn about) potential HS&E problems.
bullet Improve the time and cost estimates for more accurate budgeting.
bullet By use of visual tools (2D and 3D) improve the understanding of the planned operation for all involved parties, - along the whole duration of the DVA process.
bullet Standardise the engineer's work (peer reviews, costing, operation programmes, EOW reporting, etc.)
bullet Auto-Report Generator

Outcome from XCOMP ;

bullet Statement of Requirements (with warnings).
bullet Technical Exceptions (from Validator).
bullet HS&E Exceptions (from Validator).
bullet

Learning Experiences (from LINK, XCOMP, etc.).

bullet Operational Programme (draft / skeleton).
bullet Time Plan and Cost Plan.
bullet Well and Completion Schematics.
bullet 2D and 2D Animations.
bullet EOW Report (draft / skeleton).

XCOMP incorporates a lot of very good ideas for completion operations, - arguably an area often neglected in performance improvement processes.

 

 
     
HPHT GuidelinesGeoPressure WebsiteNexus Consulting WebsiteVestDrill WebsiteSPE WebsitePetroleum Exploration Society of Great Britain WebsiteLeading Edge Advantage Website
Copyright Think-Well (Scotland) Ltd, 2006